What development is in the Belmar pipeline that could affect 123 Main Street?
Two active projects in the pipeline — neither directly disrupts Main Street. F Street mixed-use is a marginal positive; boardwalk reconstruction is a near-term ocean-corridor headwind.
- Q1 2026 (now)Active
F Street Mixed-Use — Groundbreaking
28-unit residential over street-level retail. 0.4 mi from 123 Main. Marginal positive — likely adds walking-distance amenities (restaurant + coffee shop target tenants).
- Q3 2026Upcoming
Belmar Boardwalk Phase 2 — Construction
$3.2M sand replenishment + boardwalk reconstruction. Direct impact on eastern beach access during the work. 123 Main is 0.6 mi inland — no direct disruption, but ocean-corridor STR rentals see reduced volume during the project.
- Q2 2027Upcoming
F Street Mixed-Use — Tenant Move-In
Initial residential occupancy + ground-floor retail open. Walkability premium for inland mid-coast parcels (including 123 Main's block) firms up modestly.
No infrastructure projects (sewer, water, storm drain) on Belmar's 2026–27 capital plan affect 123 Main's block. Permit volume in the broader borough is steady (47 in the last 12 months) — no signal of a regime shift on supply.
Full borough-level permit drill-down, Planning Board minutes, and capital-plan calendar are in Scout.